Dokumen Estimasi Pembiayaan & Alokasi Anggaran Produksi
| NO | URAIAN KEBUTUHAN & SPESIFIKASI | VOLUME | HARGA SATUAN | SUBTOTAL (RP) | VENDOR / REKANAN |
|---|---|---|---|---|---|
| I | Venue, Gedung & Fasilitas | Rp 94.000.000 | |||
| 1 |
Sewa Lapangan GBK Outdoor (2 Hari)
Termasuk masa loading in & loading out
|
1 Paket × 2 Hari | 35.000.000 | 70.000.000 | Pengelola GBK Senayan |
| 2 |
Sewa Genset Silent 150 kVA + Solar
2 Unit genset standby selama acara
|
2 Unit × 2 Hari | 4.500.000 | 18.000.000 | PT Sumber Power Genset |
| 3 |
Kebersihan & Retribusi Sampah
Tim kebersihan venue 10 orang
|
10 Orang × 2 Hari | 300.000 | 6.000.000 | Dinas Kebersihan Mitra |
| II | Panggung, Sound & Lighting | Rp 134.000.000 | |||
| 1 |
Panggung Rigging Utama 14 x 10 Meter
Lengkap dengan atap terpal heavy duty & barikade FOH
|
1 Paket × 2 Hari | 18.000.000 | 36.000.000 | Megah Rigging Pro |
| 2 |
Sound System Line Array 30.000 Watt
FOH Mixer digital Allen&Heath, monitor panggung & wireless mic
|
1 Paket × 2 Hari | 22.000.000 | 44.000.000 | Harmoni Audio Sound |
| 3 |
Lighting & Stage Effect (Moving Head & Smoke)
32 Moving Head Beam, 24 Par LED, Hazer Machine
|
1 Paket × 2 Hari | 12.000.000 | 24.000.000 | Spectrum Lighting |
| 4 |
LED Screen P3.9 Outdoor Ukuran 8 x 4 Meter
Screen backdrop visual interaktif
|
1 Paket × 2 Hari | 15.000.000 | 30.000.000 | Visualtron LED Indo |
| III | Talent, Musisi & Pengisi Acara | Rp 129.000.000 | |||
| 1 |
Guest Star Utama: Sheila On 7 / Band Nasional
Durasi show 75 menit + Riders teknis
|
1 Grup × 1 Hari | 85.000.000 | 85.000.000 | Artis Management HQ |
| 2 |
Band Pembuka / Co-Headliner (3 Band)
Masing-masing band durasi 40 menit
|
3 Grup × 1 Hari | 10.000.000 | 30.000.000 | Indie Network Collective |
| 3 |
Master of Ceremony (MC Pria & Wanita)
Host energik selama festival 2 hari
|
2 Orang × 2 Hari | 3.500.000 | 14.000.000 | Talent Agency ID |
| IV | Food & Beverage (Konsumsi) | Rp 17.150.000 | |||
| 1 |
Konsumsi Nasi Kotak Panitia & Kru
Makan siang & makan malam untuk 60 orang
|
60 Porsi × 4 Kali | 35.000 | 8.400.000 | Dapur Berkah Catering |
| 2 |
Hospitality & Riders F&B Ruang Artis
Buah segar, snack premium, kopi barista & minuman ion
|
1 Paket × 2 Hari | 4.000.000 | 8.000.000 | Supermarket & Buah Segar |
| 3 |
Air Mineral Galon + Dispenser & Botolan
Untuk kru dan booth informasi
|
15 Galon × 2 Hari | 25.000 | 750.000 | Depot Air Sehat |
| V | Publikasi, Branding & Desain | Rp 28.875.000 | |||
| 1 |
Meta Ads (Instagram & TikTok Advertising)
Promosi kampanye tiket pre-sale & reguler
|
1 Paket × 1 Bulan | 12.000.000 | 12.000.000 | Meta Platform Inc |
| 2 |
Cetak Gelang Tiket RFID / Wristband Barcode
3.000 pcs gelang anti robek dengan serial barcode
|
3,000 Pcs × 1 Event | 3.500 | 10.500.000 | Percetakan Gelang Prima |
| 3 |
Cetak ID Card Panitia, Lanyard & T-Shirt Kru
Untuk 75 personel kepanitiaan
|
75 Paket × 1 Event | 85.000 | 6.375.000 | Vendor Merch Sukses |
| VI | Logistik & Transportasi | Rp 14.100.000 | |||
| 1 |
Sewa Mobil Pick Up & Elf Operasional
2 unit armada mobilisasi alat & talent
|
2 Unit × 3 Hari | 750.000 | 4.500.000 | Rental Mobil Express |
| 2 |
Sewa Tenda Sarnafil 3x3 (Tenan F&B & Medis)
12 tenda putih untuk tenant bazar & posko
|
12 Unit × 2 Hari | 400.000 | 9.600.000 | Tenda Mandiri Jaya |
| VII | Honorarium & Kru Lapangan | Rp 23.000.000 | |||
| 1 |
Honor Koordinator Divisi & Kru Lapangan (20 Org)
Honor kerja keras selama persiapan hingga evaluasi
|
20 Orang × 2 Hari | 350.000 | 14.000.000 | Tim Kru Mandiri |
| 2 |
Keamanan Internal & Tim Medis Ambulans
Ambulans standby lengkap paramedis + 8 security
|
1 Paket × 2 Hari | 4.500.000 | 9.000.000 | Palang Merah & Garda Aman |
| VIII | Perizinan & Legalitas Acara | Rp 12.000.000 | |||
| 1 |
Izin Keramaian Kepolisian (Polsek, Polres, Polda)
Izin keramaian formal & pengamanan rute
|
1 Paket × 1 Event | 12.000.000 | 12.000.000 | Instansi Berwenang |
| Subtotal Biaya Langsung (Direct Cost): | Rp 452.125.000 | ||||
| Biaya Tak Terduga / Contingency (10.00%): | Rp 45.212.500 | ||||
| Management Fee & Profit EO (15.00%): | Rp 67.818.750 | ||||
| Pajak Pertambahan Nilai (PPN 11.00%): | Rp 62.167.188 | ||||
| GRAND TOTAL ESTIMASI ANGGARAN (RAB): | Rp 627.323.438 | ||||